Timetable & operating days
Red Lizard Tunisia — Timetable
- Status
- Operating — services running
- Running days
- Selected dates
Scheduled services
Representative services. Running days vary — always check the operator's own site before travelling.
| Departs | Train | From | To | Days |
|---|---|---|---|---|
| 11:00 | RED 1 | Metlaoui | Moulares | Selected dates |
| 12:00 | RED 10 | Moulares | Metlaoui | Selected dates |
| 12:20 | RED 2 | Metlaoui | Moulares | Selected dates |
| 13:20 | RED 11 | Moulares | Metlaoui | Selected dates |
| 13:45 | RED 3 | Metlaoui | Moulares | Selected dates |
| 14:05 | RED 4 | Metlaoui | Moulares | Selected dates |
| 14:45 | RED 12 | Moulares | Metlaoui | Selected dates |
| 15:05 | RED 13 | Moulares | Metlaoui | Selected dates |
| 15:30 | RED 5 | Metlaoui | Moulares | Selected dates |
| 16:30 | RED 14 | Moulares | Metlaoui | Selected dates |
Latest news from Red Lizard Tunisia
- APPEL GENERAL A CANDIDATURE N° DCERFT/DGMI/N° 01/2026 DU 2026/08/12 POUR LA PRESELECTION DES BUREAUX D’ETUDES OU GROUPEMENT DES BUREAUX D’ETUDES POUR LA REALISATION D’UNE : « MISSION D’ETUDE D’UN CORRIDOR FERROVIAIRE NORD – SUD HAUTES PERFORMANCES EN TUNISIE – PHASE I / ETUDES DE FAISABILITE ET D’INGENIERIE PRELIMINAIRE » — AVIS DE REPORT 16 Sep 2026
- Avis d’Appel d’Offres N° 01/2026 : Occupation temporaire de terrains commerciaux DSCVBI-N°-01-2026_-FR 31 Aug 2026
- Appel à candidature : Présélection de bureaux d’études pour l’étude du corridor ferroviaire Nord-Süd (Phase I) Avis-dappel-doffres-en-Francais 17 Aug 2026
Headlines from Red Lizard Tunisia’s own website. Claim this railway to link straight to their news.