Facts
| Type | Rail tunnel |
|---|---|
| Country | Switzerland |
| Region | Switzerland |
| Carries | rail |
| Length | 49 m |
| Status | Operational |
Location
45.739526, 4.848753 Open in OpenStreetMap ↗
Waiting for files
No community photos or documents for Raccordement de Lyon-Guillotière à Lyon-Part-Dieu yet — be the first to add one.
Upload the first fileBuilt by the community
Every fact and file here is contributed and checked by the LopoRail community.
Add yoursHave photos or a correction for Raccordement de Lyon-Guillotière à Lyon-Part-Dieu?
Send them through the contribute form — approved files appear on this page with your credit.
ContributeNearby structures
- Raccordement de Lyon-Guillotière 1.1 km CH
- Tunnel de Service Liaison Ligne B - Ligne D 1.4 km CH
- Ligne D 3.1 km CH
- Ligne C 3.4 km CH
- Ligne A 4.0 km CH
- Ligne de Lyon-Perrache à Genève (Frontière) 5.3 km CH
More in Switzerland
Aekenmatt
Aequadukt
294 m long
Aeschlimann
11 m long
192 m long